Escambia County Pinestead Road/Longleaf Drive Neighborhood Improvement Plan
Map Key and List of All Projects

Map Number
Totals
Project Name
Project Category
1
19

Wedgewood School as Community Center

Community Center
2
11

Rolling Hills Road and Wedgewood Road Street Lighting

Lighting
3
9

Wymart Road/Longleaf Drive Traffic Signal

Traffic Operations
4
7

Capital Boulevard / Diamond Dairy Road Drainage

Drainage
5
6

More Police Patrol Longleaf Drive

Police Patrol
6
5

Wedgewood Community Sidewalk

Sidewalks
7
5

Sidewalk from Capital Boulevard, Trammel Boulevard, and Fruitvale Street

Sidewalks
8
5

Lights from Capital Boulevard, Trammel Boulevard, and Fruitvale Street

Lighting
9
5

Community Redevelopment Area Grants

CRA Grants
10
5

Petunia Avenue Drainage

Drainage
11
4

Drainage Improvements on Wingfoot Way between Rolling Hills Road and Wagner Road

Drainage
12
4

Preserve Tree Canopies - Longleaf Drive

Beautification
13
3

Fire Hydrant Upgrade Hillcrest Avenue Water Main

Emergency Support
14
3

Truck Restriction Routes (Pinestead Road, Rolling Hills Road, Longleaf Drive)

Traffic Operations
15
3

Speed Bumps in the Residential Area of Pinestead Road West of the Railroad Tracks

Traffic Operations
16
3

3-Way Stop at Alfonso Street and Wingfoot Way

Traffic Operations
17
2

Drainage on Rolling Hills Road to Bud Johnson Road

Drainage
18
2

Neighborhood Gateway Signs (Floresta, Wedgewood, Rolling Hills, Longleaf)

Beautification
19
2

Widen and Resurface Diamond Dairy Road and Wingfoot Way

Maintenance
20
2

Additional Emergency Access - Rolling Hills Road

Emergency Support
21
2

Wedgewood Community Resurfacing

Maintenance
22
1

North Side Drainage on Kyle Drive

Drainage
23
1

Neighborhood Housing Rehabilitation and Improvements

CRA Grants
24
1

Traffic Signal at Rolling Hills Road and Kemp Road

Traffic Operations
25
1

Servicing of Fire Hydrants along Pinestead Road

Emergency Support
26
1

3-Way Stop at the Intersection of Wingfoot Way and Rolling Hills Road

Traffic Operations
27
1

Improve Sight Distance at Intersection of Capital Boulevard and Diamond Dairy Road

Traffic Operations
28
1

Sidewalks on Rolling Hills Road

Sidewalks
29
0

Traffic Calming Devices

Traffic Operations
30
0

Purchasing Additional Land from the School Board

Community Center
31
0

La Rosa Street Drainage

Drainage

NAC Changes-Additional Projects-1

Map Number
Totals
Project Name
Project Category

32

N/A

Drainage on Hampton Road from Wagner Road to Rolling Hills Road

Drainage

33

N/A

Drainage improvements on Farris Avenue

Drainage

34

N/A

Repair Crushed Culvert at Longleaf Drive and Pine Forest Road

Drainage

35

N/A

Review Existing Truck Routes

Traffic Operations

36

N/A

Fire Hydrants in Wedgewood Community

Emergency Support

37

N/A

Street Lighting on Longleaf Drive to Kemp Road and Around Kemp Road

Lighting

38

N/A

Sidewalks on Wingfoot Way

Sidewalks

39

N/A

Repair Dips in Wagner Road at Hampton Road

Traffic Operations

NAC Changes Removed Projects-2

Map Number
Totals
Project Name
Project Category

N/A

0

Hillcrest Avenue Drainage

Drainage

N/A

0

Replace "25 MPH Speed Limit Sign" West of Railroad Tracks on Pinestead Road

Maintenance

N/A

7

Retiming of Traffic Lights at US 29 and Pinestead Road, and US 29 and Burgess Road / Diamond Dairy

Traffic Operations

N/A

N/A

Removed Police Station from Community Center

Community Center

1 Projects added by the NAC at the May 19, 2008 meeting are not prioritized by votes.
2 Project removed from the list have previously been completed. This was verified by Escambia County Staff at the May 19, 2008 NAC meeting.